Recently, Doshine Measurement and Control reported that the first set of equipment for the Simandou iron ore project in Guinea, in which it is participating, has successfully completed installation and has now entered the commissioning phase.

As a large‑scale iron ore project that has attracted global attention, the Simandou iron ore project in Guinea imposes extremely high requirements on the precision, reliability, and adaptability of its testing equipment. Since the project's inception, the Doshine Measurement and Control team has consistently upheld a professional and rigorous approach, overcoming numerous challenges such as cross‑regional coordination and complex equipment transportation, and has devoted itself wholeheartedly to the equipment assembly work.
During the installation process, international standards and project specifications were strictly adhered to. From the precise alignment of core components to the coordinated integration of the overall system, every step was executed with meticulous attention to detail.

The Doshine Measurement and Control team has already started electrical commissioning of the equipment on site, striving to ensure the best possible performance to facilitate the smooth progress of the Simandou iron ore project.
Doshine (Shanghai) Measurement & Control Technology Co.,Ltd
沪ICP备16036159号-1
Address: Room 610, No.47 Zhengyi Road, Yangpu District, Shanghai
MAIL:doshinesh@126.com