
After three months of day and night struggle and coordination, the raw material unit ore automatic sample preparation system quantitative shrinkage crushing device manufacturing, installation, commissioning and strip operation have all been completed. And on February 22, 2019, we successfully passed the physical handover between the owner, the supervisor, and the constructor.

On February 12, 2019, Doshine (Shanghai) Measurement & Control Technology Co., Ltd. (Shanghai HORRS Measurement & Control Engineering &Technology Co., Ltd.) 2018 commendation conference and 2019 welcome conference was held in Xuzhou.

On December 21, 2018, as the mine "Zhengming" wheel leaned on Zhoushan Shulanghu ore transit terminal, and began to load more than 70,000 tons Vale of Brazil BBRF powder sold to Japan, that marks the project for distribution of iron ore to Northeast Asia has already started. This is the first time in the southern coastal ports of China's mainland, which has laid a solid foundation for the construction of the Northeast Asian iron ore distribution center at Ningbo Zhoushan Port.

The second batch of sampling and preparation equipment of the whole plant sampling equipment project of Vietnam Hoa Phat Dung Quat Steel has passed A inspection ,and all goods have been successfully delivered to port before 24:00 on November 14, 2018.

Recently, ore and coke automatic sampling device project of Ironmaking Engineering of Baosteel Zhanjiang Iron and Steel Co., Ltd. has already started, which is undertaken by our company.
Doshine (Shanghai) Measurement & Control Technology Co.,Ltd
沪ICP备16036159号-1
Address: Room 610, No.47 Zhengyi Road, Yangpu District, Shanghai
MAIL:doshinesh@126.com